WEST WINDSOR-PLAINSBORO SCHOOL DISTRICT

West Windsor Middle School

CEG is the Engineer of Record for the new 180,000 ft2 Middle School. CEG is responsible for the design of energy conservation mechanical and electrical systems which include closed loop ground source heat pump systems, variable speed pumping, T-8 lamps with solid state ballasts and an energy management and control system.

West Windsor Elementary School

CEG is the Engineer of Record for a new 90,000 ft2 Elementary School. CEG is responsible for the design of the HVAC and Electrical systems. The HVAC system will consists of a boiler/chiller arrangement and four pipe distribution system. T-8 lamps with solid state ballasts and an energy management and control system will be utilized.

District Wide

CEG performed all engineering services for a district wide lighting retrofit. Scope included lighting design and applications for PSE&G standard offer program.  The project was implemented through a 10 year energy performance contract.