Marina Thermal Energy/Electric Distribution Plant
- Atlantic City, NJ CEG was responsible for engineering and design of all process-related mechanical systems (hot water, chilled water, cooling tower water, and controls) in the plant. CEG also prepared the detailed electrical design for the project, including the 12.47 kV outdoor substation, 12.47 kV - 69 kV transformers, 69 kV termination structures, protective relaying (including 69 kV transformer protection), and metering and SCADA interface with Conectiv.
|
|
![]() ![]() |
|
|
|